Building a Method with Multiple Scheduled Experiments in SCIEX OS Software


Date: 03/02/2026
Categories: Software

0 Votes
   Print    Rate Article:

For research use only. Not for use in diagnostic procedures.


Answer

When building an acquisition method with multiple experiments, each experiment to be scheduled can have different start and stop times. Click Options in method pane, and select Apply experiment scheduling. Enter start run time and stop run time for each experiment. The start and stop run time for each experiment are shown in the method overview section.

experiment scheduling 1.PNG
experiment scheduling 2.PNG